Premier Foods Barnsley required a phased upgrade of their emergency lighting central battery systems to improve reliability, meet current standards, and future-proof their infrastructure.
When Morrisons Greys needed a solution to simplify emergency lighting testing and ensure compliance with BS5266-1 safety standards, we delivered an efficient, minimally disruptive installation.
When a fault occurred on the emergency lighting inverter system that threatened the safety compliance and operational continuity at Genting Casino Sheffield, swift and expert intervention was critical.
Cineworld Ruislip, part of a leading UK cinema chain, faced a pressing challenge. Their emergency lighting inverter system had grown outdated and unreliable, posing a potential risk to safety and compliance standards.
Cineworld Boldon needed a routine 3-hour emergency lighting discharge test – a standard
requirement to ensure safety and legal compliance. During the check, the system
unexpectedly failed. The emergency lights didn’t hold up for the full duration, signalling a deeper issue.